CMTI
Lead Time Reduction In A Pcb Design Company
Masters Dissertation of S. Aithal, 1988
- Considers a PCB design company involving multiple, concurrent
design projects with contention for technical/human resources
- Develops a probabilistic re-entrant line model to capture the
flow of design projects, contention, and scheduling issues
- Originates several simple strategies to reduce design lead
times through: input control, load balancing, and innovative
scheduling